A Wider Opening
The new concrete-block walkway is going to go between the two raised beds in the front yard. The walkway will be 4 feet wide -- the standard width for walkways, sidewalks, etc.
Originally, the space between the raised beds was going to be 4 feet. But what you're looking at is 6 feet. We moved each wall out one foot because otherwise, one of the walls would have been on top of our water main. We didn't think it was a good idea to encase a water main in concrete here in earthquake-land.
So we'll have a one-foot strip between the walkway and raised bed on either side. We'll probably put plants there.
Concrete Pour
Patio.
Trashcan slab.
Stair.
The contractor and I used scraps of rebar to make sure we were on the same page about how the patio is going to be tiled.